As mentioned in my previous post, the interior of the house was pulled together in the final month before possession.  Once the exterior walls and windows were installed, the inside of the house was completed on schedule, with barely any hang-ups.
Here's a summary:


The plumbing and installation of the shower and bathtubs were completed early on
May 17, 2013

May 17, 2013
 Shortly after the plumbing was done, the heating, cooling and ventilation ducts were installed
May 19, 2013
 Before the drywall could be installed, the builder was required to have inspections done by the Village.  This was a little bit of a process, but once approved, they were back on track and the walls were erected and taped.

 Electricians came in and wired the entire house in 2 days -- pot lights, outlets and undercounter lighting, done.


***

So remember when we had to pick all of our interior finishes from the design center back in January? Well this is the point where all of those tiny 3"x 3" swatches were going to start showing up...in a much larger format.  How nerve-racking.  

After drywall, came the first coat of paint.  The optional paint upgrade included "most" of the house, with the exception of bedrooms and bathrooms.  So "most" of house is painted in Sherwin-Williams Techno Gray

June 18, 2013

Don't worry Xander, we'll paint your room later :(

We took a road trip up to Winnipeg at the end of June, to pick Xierra up for the summer.  When we returned, the doors to the house were locked, and we could no longer get inside *sad face*

Looking in through the front window, we were pleasantly surprised to see that our BEAUTIFUL wood floors had been installed while we were away!  The trim was also installed.

Determined rebels that we are, we found a way to break into the house (i.e. there was a rope peeking out from the bottom of the garage door - we pulled it up and the door opened :P)

The cabinets!!  And the start of my island!!
I'm so giddy!
Complete with roll-out tray garbage cans and lazy susan :)

We were glad to see that the tile was also installed in bathrooms upstairs

 ...along with the vanities


And what's a house without a furnace
June 30, 2013
A mid-week visit revealed an unexpected boo boo -- they installed the wrong color cabinets for our bar. They were supposed to be Kona (dark espresso) to match the island.  Someone effed up the order and they accidentally got the cabinets in Chiffon instead.  I was able to catch it just before the carpenters were about to install the lower cabinets -- a call to the construction manager was all it took to get the new one's ordered..

 

Otherwise, there wasn't too much progress from our last visit -- just the vanity in the powder room and the toilets in all of the bathrooms were installed


July 10, 2013

 The next time we returned, it looked like the builder was starting to get the house cleaned up - they removed the protective sheets on the floors, to reveal the stunning beauty beneath:
July 12, 2013

The carpet was finally installed.  The entire upstairs is carpeted and the family room on the main floor (off of the kitchen) is also carpeted: 

July 14, 2013
The construction manager didn't mess around -- 4 days later, the new cabinets were installed and we were back on track..

The island still needed some finishing at this point, and the counters were still on order, but it was certainly coming together nicely


July 18, 2013 
There was another little set-back, when we found out that our counters weren't going to be installed in time for our final walkthrough.  We did the walkthrough anyway and returned the day that they were completed:

July 22. 2013
Our closing took place on Friday, July 26th.  We got our keys and officially moved in later that day.
Eager beavers, we were, to finally call this place home. 

The Build.

Building a house.  Certainly on the top of my (imaginary) list of 'things I love to hate and hate to love'.
It was fun and stressful and painful and miraculous, all at the same time... kind of like childbirth, I guess - except the baby lives in you and you live in the house? Whatevs.

Anyway, getting on with this post..

I won't bore you with the billions of details that were involved in the building process, but I will share a brief summary of how the house went from this:

to this:
in approximately 3 months.
[by far, the longest 3 months of my liiiiife]

I will preface by saying that we "purchased" the house back in October 2012 - signed some paperwork to hold the land, put down a down payment, etc.

We stared at a SOLD sign and an un-dug site for almost 6 months before they actually broke ground. Frustrating, to say the least, but once they did break ground, the progress was fast-ass (that's a little faster than 'fast'!)

Here's a series of photos to give you an idea of how quickly it went:

This is after they levelled the land:
April 2, 2013
FINALLY READY to start diggin'.  Let me tell ya -- I never imagined that seeing a bulldozer would  ever excite me, as much as it did on this day.  A bulldozer made my day - who woulda' thunk..
April 4, 2013
We've got a hole! (a flooded hole, but a hole none-the-less!)
April 9, 2013
 Foundation poured
April 21, 2013
Roxy, super-excited!  
Brian, fake-excited
and Xander, "that's-a-big-rock-over-there-excited"


 Joists.  That is all.
April 30, 2013
 First floor framed, what-whaaat!
May 1, 2013
 Creeper shot of the second floor (didn't want to get too close with all those people working)
 I can see my bedroom!
May 7, 2013
 RAISE THE ROOOOF!
May 11, 2013
 An interior shot from the back of the house
May 11, 2013

The shingles are on, the windows are in, and the porch is...railed?
May 17, 2013
The builder gave us an option to build a deck.  It was built and ready for BBQ'ing before the rest of the house was even finished!
May 31, 2013
 Special delivery!  DRYWALL
June 5, 2013
 Jumping for joy cuz he's just so darned excited for drywall!
June 5, 2013

Marking my territory (with a Sharpie, not pee.)
June 8, 2013
 Drywall is up and its really starting to look like a "house" 
June 15, 2013
 Siding is started on the exterior

First coat of paint goes up
June 18,2013
 Siding is all done now.  Good, cuz the house felt naked without it.
June 18, 2013
 An (unpainted) front door is attached and for the next month, the rest of the work is all done on the interior of the house.
June 23, 2013

|
|
|
|
|
|
|
|

The house gets a driveway and some landscaping about a week before "move-in"day, and it's as close to being ready as it'll ever be:
July 24, 2013
So that's the build. Nothing to it! (not)
I have to say that it was an extremely rewarding experience, and now that I'm here enjoying it, it was well worth the wait.

Stay tuned for more house progress posts..

Related Posts Plugin for WordPress, Blogger...